跳到主要内容

电气施工要求

 

Select the state below for resources and information in your area. 

To continue improving upon our safe and reliable service, we now have an inspection process for all conduit systems that contain Black Hills Energy wire. 请 回顾这个过程 to ensure your conduit system is inspected prior to backfill.

构建器和开发人员资源

If you have questions, don’t hesitate to contact one of our 建筑的代表.

关税

南达科他州电价 

夏安,怀俄明州

构建器和开发人员资源

商业建筑手册 
Standards for Electric Meter Installation and Use 

更多的信息

Download our printable Net Metering packet for more information about Net Metering.

常见问题

Below are the answers to some of the most commonly asked questions about utility service to your new home or business. 

What is the first step in setting up new 电 service?

The 服务请求 is the starting point for all 电 utility needs whether it is a new 服务请求, 更改服务请求, 临时服务请求, 等. This first step creates a 服务请求 number for the customer and establishes the routing for a customer's particular request. No activity/work will commence until this request is made. A customer can make the request by using the online Black Hills Energy portal or call the call center and speak to a representative of Black Hills Energy.

Can the phone wires and television wires go in the same trench?

是的. Phone wire and television wires can be laid directly with the power cable in the trench. Proper spacing between these facilities and 电 lines are required and outlined int he National Electric 安全 Code. Advanced coordination with the utility companies is required for this to be successful.

What about water, sewer, and gas lines?

Generally, water, sewer, and gas lines are installed in separate trenches.

Does it matter if my buried 电 service goes under a driveway or patio?

You should make every effort to place the buried service in areas that will not be paved. Black Hills Energy installs all underground 电 services in conduit and t在这里fore can accommodate these scenarios. To avoid additional installation cost you should coordinate with Black Hills Energy if you need to install pavement or concrete prior to the installation of 电 service or that we can install the appropriate conduit under your facilities.

Is t在这里 a preferred location for the meter?

是的. Having the meter in an easily accessible location for our advanced metering system is important. This ensures accessibility to the meter if Meter Technicians need to perform maintenance. 正常情况下, 房屋的侧面或后部, in 关闭st proximity to existing 电al facilities, is preferred but in no instances should a meter be located inside a building, 结构, 或附件.

Is temporary construction power optional?

是的. Temporary construction power is optional but can be provided at customer request. T在这里 is a small fee (at time of writing) for this service and customer must provide the temporary meter facilities inspected by local agencies. If 电 facilities already exist in 关闭 proximity to the customer's building site temporary service can be provided in a short time frame. If existing 电al facilities do not exist near the customer's building site then alternative energy sources may be necessary prior to extension of 电 line to customer's property. 在这种情况下, temporary construction power would be available only after completion of the line extension.

Who is responsible for the maintenance of the service line?

We maintain overhead and underground services up to the customer connection.

客户连接在哪里?

For overhead services, the connecting point is the customer-owned weatherhead. For underground services, the connecting point is the customer-owned peter can. We provide the meter, which you pay for as a part of your monthly service charge.

Can I request underground 电 service?

是的, overhead or underground extensions are covered by the Line Extension Allowance for a new home.

电